Production Lead & Delivery Times are a Function of the Finish Selected
Due to unprecedented demand, as well as other local and global factors, Palmer Industries product lead times have become substantially extended. This is a situation mostly beyond our control and is changing rapidly.
Lead times start from the date of the receipt of a
Confirmed Purchase Order or Signed Drawing Approval
Limited Time Only Through Dec 31st*
Excluded Sink Leg Styles: Essex, Kingston, Providence, Minimal, Linear, Bristol, Regency, Signature*
finish
- Polished Chrome (PC)
- Polished Nickel (PN)
- Satin Nickel (SN)
- Aged Nickel Un-Lacquered (AN)
- Powder Coat Semi-Matte Black (MB)
Sink Leg
Vanities
- 3 - 4 Weeks*
- 3 - 4 Weeks*
- 8 - 10 Weeks
- 14 - 16 Weeks
- 6 - 8 Weeks
images
- Image
- Image
- Image
- Image
- Image
Bistro
Shelving
- 8 - 10 Weeks
- 8 - 10 Weeks
- 8 - 10 Weeks
- 20 - 24 Weeks
- 8 - 10 Weeks
Rack
Shelving
- 4 - 5 Weeks*
- 4 - 5 Weeks*
- 8 - 10 Weeks
- 20 - 24 Weeks
- 8 - 10 Weeks
- Polished Brass Un-Lacquered (PBUL)
- Polished Brass Lacquered (PBL)
- Satin Brass Lacquered (SBL)
- Satin Brass Waxed (SBW)
- 3 - 4 Weeks*
- 6 - 8 Weeks
- 6 - 8 Weeks
- 6 - 8 Weeks
- Image
- Image
- Image
- Image
- 8 - 10 Weeks
- 10 - 12 Weeks
- 10 - 12 Weeks
- 8 - 10 Weeks
- 4 - 5 Weeks*
- 10 - 12 Weeks
- 10 - 12 Weeks
- 8 - 10 Weeks
- Aged Brass Un-Lacquered (ABUL)
- Aged Brass Lacquered (ABL)
- Oil Rubbed Bronze (ORB)
- 14 - 16 Weeks
- 14 - 16 Weeks
- 14 - 16 Weeks
- Image
- Image
- Image
- 18 - 20 Weeks
- 18 - 20 Weeks
- 18 - 20 Weeks
- 18 - 20 Weeks
- 18 - 20 Weeks
- 18 - 20 Weeks
- Polished Brass PVD (PBPVD)
- Satin Brass PVD (SBPVD)
- Polished Gold PVD (PGPVD)
- Satin Gold PVD (SGPVD)
- 18 - 20 Weeks
- 18 - 20 Weeks
- 18 - 20 Weeks
- 18 - 20 Weeks
- Image
- Image
- Image
- Image
- Not Available
- Not Available
- Not Available
- Not Available
- Not Available
- Not Available
- Not Available
- Not Available
These Production Lead Times are current as of 9/22/2023 and supersede all other lead times shown elsewhere – check back often.